+1 786-546-6546 · [email protected]
ALUCONIUMFACADE & GLASS SYSTEMS
Unitized Curtain Wall

Unitized Curtain Wall Systems in Miami & South Florida

Unitized curtain wall for towers, hotels and condos in Miami: factory-glazed panels, design-assist, signed shop drawings and NOA-approved systems.

Unit width
≈ 5 ft (1.5 m)
Unit height
One floor, 10-14 ft
Glazing
100% in the factory
HVHZ
TAS 201 / 202 / 203
SYS-01 · Curtain Wall Systems

About unitized curtain wall

A unitized curtain wall is built in the factory, not on the scaffold. Each panel, typically about 5 ft wide and one floor high, is framed, glazed and sealed under controlled conditions, then lifted into place and hooked onto anchors at the slab edge.

Because the glazing work happens indoors, quality is easier to control and the facade can close in floor by floor while other trades work inside. For towers, hotels and condominiums where crane time, weather and schedule drive the program, unitized is usually the faster and more predictable choice.

Unitized Curtain Wall system
How it is built

Anatomy of unitized curtain wall

  1. Interlocking split mullionsEach unit has male and female vertical mullions that slide together with the neighboring unit, forming a weather seal and allowing lateral movement.
  2. Stack jointThe horizontal joint at each floor, where the unit above meets the unit below. It absorbs slab deflection, thermal expansion and inter-story drift.
  3. Slab-edge anchorsCast-in embeds or post-installed anchors with three-way adjustment, so every unit can be set to line and level from the floor above.
  4. Insulated & laminated glassLow-E insulated glass units, laminated where impact or retention is required, with warm-edge spacers and structural silicone or gaskets.
  5. Spandrel zoneOpaque glass, shadow box or metal panels with insulation and a back pan that hide the slab edge and meet the energy code.
  6. Drainage & sealsPressure-equalized chambers, gaskets and weep paths that drain any water that enters back to the outside.
  7. Perimeter fire containmentSafing and smoke seal between the slab edge and the wall, tested as a system (ASTM E2307).
Unitized Curtain Wall architecture
Unitized Curtain Wall

Engineered and tested for Miami's High-Velocity Hurricane Zone.

Codes, testing & approvals

Performance standards

A curtain wall is one of the most tested assemblies in a building. These are the tests and approvals our engineers design to and document for every project.

ASTM E283 · Air leakage

Measures air infiltration through the wall under a pressure difference. Commercial curtain wall is commonly specified at 0.06 cfm/ft² at 6.24 psf.

ASTM E331 · Static water

No uncontrolled water penetration at the project test pressure, proving the seals, gaskets and internal drainage work together.

AAMA 501.1 · Dynamic water

Wind-driven rain simulated with a high-velocity fan, closer to a real tropical storm than a static test.

ASTM E330 · Structural

The wall is loaded to its design wind pressure and to a 150% proof load, with deflection and permanent set measured.

AAMA 501.4 · Inter-story drift

Floors are moved relative to each other to confirm the wall accommodates building sway and slab movement without failure.

TAS 201 / 202 / 203 · HVHZ

Miami-Dade protocols for large-missile impact (a 9 lb 2x4 at 50 ft/s), static pressure and thousands of cyclic pressure reversals.

Miami-Dade NOA / FL Product Approval

The approval that lets a system be permitted in Miami-Dade and Broward (HVHZ) or elsewhere in Florida, matched to sizes and design pressures.

AAMA 501.2 / AAMA 503 · Field testing

Water testing of the installed wall on site, used to verify workmanship on the first areas installed.

Code references are summarized for orientation. Final requirements are confirmed by the engineer of record and the building department for each project.

For architects & designers

Design considerations

What our engineering team reviews with the design team before the drawings are final.

  1. Lock in the embeds earlySlab-edge embeds must be on the structural drawings before the concrete is poured. We issue embed layouts at the start of design-assist.
  2. Plan the hoistingUnits are set with a monorail, mini crane or the tower crane. Logistics and storage are planned with the general contractor.
  3. Treat it as a long-lead itemEngineering, testing and fabrication take time. Awarding the curtain wall early protects the dry-in date.
  4. Repetition drives economyThe more identical units, the lower the cost per square foot. Corners and transitions are detailed as special units.
  5. Think about maintenanceWindow-washing equipment, tie-backs and glass replacement are considered in the design.
Unitized Curtain Wall detail 1Our project · International
Compare

Curtain wall systems compared

A quick reference our engineers use with architects and owners when choosing the right system.

UnitizedStick-builtStructural glazing / point-fixedStorefront & window wall
AssemblyFactory-framed and glazed unitsFramed and glazed on siteGlass bonded or point-supportedFramed on site between slabs or at grade
Best fitTowers, hotels, condosLow and mid-rise, podiums, lobbiesLobbies, atriums, feature wallsGround floors, retail, slab-to-slab
ScheduleFastest close-in on repetitive floorsFlexible, more site laborDetail-intensive, engineered per projectFast on standard openings
Quality controlHighest, glazing done indoorsDepends on site conditionsVery high, adhesion testedStandard
LookNarrow joints, stack-joint linesCaptured caps or SSGFlush, frameless glassVisible framing, doors integrated
Scope of supply

What we supply

One package from design-assist to closeout, so there is one team accountable for the result.

  • System selection and design-assist from the architectural set
  • Stack-joint and slab-edge anchor design for building movement
  • Shop drawings and calculations by a Florida-licensed PE
  • Factory-assembled, glazed and sealed panels
  • Insulated, laminated and spandrel glass make-ups
  • Installation management with licensed and insured partners
Options

Options & specifications

Final systems, glass and finishes are confirmed per project in shop drawings and submittals.

GlassLow-E insulated, laminated impact glass, tinted, fritted or spandrel
Frame finishAnodized or PVDF in any color
FeaturesVertical fins, horizontal sunshades, operable vents, integrated spandrel panels
ApprovalsMiami-Dade NOA or Florida Product Approval for the wind zone
How it works

From plans to closeout

  1. Plans reviewSend drawings and specs. We review the scope, the wind zone and the code path, and list any questions.
  2. ProposalA priced proposal with the system, glass and finish, plus value-engineering options where they help budget or lead time.
  3. Engineering & approvalsShop drawings, structural calculations by a Florida-licensed PE, product approvals and samples for the architect's review.
  4. FabricationSystems are fabricated to the approved drawings and delivered to suit the site schedule.
  5. InstallationInstallation by licensed and insured partner crews, with our project manager on site. The permit is pulled by the contractor of record.
  6. CloseoutPunch list, warranties, as-builts and maintenance information handed over.
Questions

Unitized Curtain Wall: FAQ

When does unitized make more sense than stick-built?

On taller buildings with repeating floors, tight schedules or limited site access. Factory glazing reduces site labor and lets the building close in faster.

Can unitized panels meet HVHZ requirements?

Yes. In Miami-Dade and Broward we propose systems with a current Miami-Dade NOA or an HVHZ-rated Florida Product Approval, and the design pressures are confirmed in the engineering.

How fast can a unitized curtain wall be installed?

Once units are on site, a crew can typically close in floors much faster than with a site-glazed system, because glazing and sealing are already done in the factory.

Does unitized curtain wall need a performance mock-up?

Large projects usually require a laboratory mock-up tested to the project specification (air, water, structural, drift). We plan and support the mock-up as part of the engineering.

Quote request

Request a Unitized Curtain Wall quote

Send the scope, drawings or a link to the bid set. We review it and reply with questions, a system proposal or a price.

  • Free, no-obligation quote or bid
  • Value-engineering options included
  • Scope review by our technical team
  • One point of contact from bid to closeout

Prefer to talk to our estimating team?

Up to 8 MB total. For full bid sets, paste a link in Details.